菲律宾PEZA与Meralco合作升级园区电力供应 | 税收与基建激励新政
作者:东南亚合规中心编辑团队
TL;DR · 核心要点
菲律宾经济特区署(PEZA)与马尼拉电力公司(Meralco)签署MOU,授权Meralco在PEZA管理的433个经济特区内设计、建设、拥有并运营配电设施,以提升供电可靠性并支持绿色低碳园区发展。关键合规信息包括:1)依据《CREATE MORE法》,PEZA有权注册嵌入式能源设施并授予财政与非财政激励;2)嵌入式发电/配电项目可适用无搁浅成本的简化电价机制;3)该安排强化了PEZA对制造、数据中心、物流等高附加值产业的电力保障能力。对企业而言,此举将显著降低用电成本(逼近东盟补贴电价水平),增强投资竞争力,并为计划入驻或扩建的外资企业提供更稳定、可持续、具成本优势的能源基础设施。
✅ 合规行动清单 · Compliance Checklist
- ›已入驻PEZA园区的中资企业应于2026年Q1前向PEZA提交嵌入式光伏或微电网项目意向书,以申请CREATE MORE项下加速审批及税收抵扣
- ›计划在巴丹、阿尔拜或巴拉望新生态园区投资建厂的企业,须在土地签约前与Meralco联合开展电力负荷与可再生能源可行性评估
- ›所有PEZA注册企业应在2026年6月30日前更新能源使用申报表,列明现有/拟建分布式电源设备,以便自动纳入新电价核定机制
- ›Submit embedded energy project proposals (e.g., solar, microgrid) to PEZA by Q1 2026 to qualify for CREATE MORE fast-track approvals and income tax holidays.
- ›Engage Meralco jointly with PEZA for pre-investment power load and renewable feasibility studies before finalizing land acquisition in Pantao, Palawan, or Baguio Ecozones.
- ›Update your PEZA Energy Usage Declaration Form by 30 June 2026 to include all existing or planned distributed generation assets for eligibility under the new stranded-cost-free tariff framework.
English Summary
PEZA and Meralco signed an MOU on 03 December 2025 enabling Meralco to design, build, own, and operate power distribution infrastructure within PEZA-managed ecozones—subject to permits and definitive agreements. This initiative implements provisions under the CREATE MORE Act (RA 11982), which authorizes PEZA to register embedded power, water, telecom, and environmental facilities and grant fiscal/non-fiscal incentives. Key implications: (1) Foreign locator companies in PEZA zones may access competitively priced electricity via embedded generation (e.g., on-site solar), free from stranded cost pass-throughs; (2) Power reliability improvements directly benefit manufacturing, data centers, and logistics investors; (3) The framework supports ESG-aligned eco-industrial park development. Affected entities include all PEZA-registered export-oriented firms and new applicants. No implementation deadline is specified, but early engagement with PEZA and Meralco is advised for upcoming projects in zones like Pantao (Albay) and Palawan Mega-Ecozone.
⚡ 这篇文章的要点太复杂?让 AI 帮你 30 秒解读
立即咨询 →